China OEM 3d Plastic Mold - Plastic Injection Molding For Trash Can / plastic bucket – Zetar

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

"Control the quality by the details, show the strength by quality". Our company has strived to establish a highly efficient and stable staff team and explored an effective quality control process for Molds For Plastic Toys , Plastic Mold Maker , Precision Injection Mold Maker , If you are interested in any of our products or would like to discuss a customized order, please feel free to contact us.
China OEM 3d Plastic Mold - Plastic Injection Molding For Trash Can / plastic bucket – Zetar Detail:

Mold Description:

1-Start from part design analysis

2-Mold design drawing and DFM report available so you can see how is the mold going to be before mold making

3-If product is complex,moldflow report will be present as well

4-In house mold making shop ensure you mold quality under well control.

5-Normally it takes 20-40 days to make mold,precise time depends on part design

Company Information:

Zetar Industry Co.,Limited from Shanghai China.
Our company has In-house tooling shop- fully equipped 6000 square feet tool room,making sure your molds making in house,providing free mold routine maintenance,and also mold repair work if you need.
Meanwhile 90 ton – 1100 ton injection molding machines 20 sets,30000 square feet injection molding room including 250 square feet M7 class clean room.We can produce parts from 0.01pound to 13 pounds.
If you have any plastic related product need to make,please feel free to email me info@zetarmold.com
www.zetarmold.com

FAQ:

1. Are you a trading company or a manufacturer?

We are a manufacturer as you can see our workshop as above.

2. What kind of trade terms can you do?
 EX-WORKS,FOB,CIF,DDP DDU
 
3. What is your terms of payment?
 50% Mold cost deposit,balance mold cost +50% production cost paid when samples confimed,Balance production cost paid against copy of B/L. We accept T/T
 
4. Do you support OEM ?
 Yes, we can produce by technical drawings or samples.
 
5. How about your delivery time?
 Generally, it take 40 days ( 30 days do mold and 10 days do mass production).
 
Welcome to contact us: 
TEL: 0086-13564311131
Website:www.zetarmold.com

Product detail pictures:

China OEM 3d Plastic Mold -
 Plastic Injection Molding For Trash Can / plastic bucket – Zetar detail pictures

China OEM 3d Plastic Mold -
 Plastic Injection Molding For Trash Can / plastic bucket – Zetar detail pictures

China OEM 3d Plastic Mold -
 Plastic Injection Molding For Trash Can / plastic bucket – Zetar detail pictures

China OEM 3d Plastic Mold -
 Plastic Injection Molding For Trash Can / plastic bucket – Zetar detail pictures

China OEM 3d Plastic Mold -
 Plastic Injection Molding For Trash Can / plastic bucket – Zetar detail pictures

China OEM 3d Plastic Mold -
 Plastic Injection Molding For Trash Can / plastic bucket – Zetar detail pictures


Related Product Guide:
Modern Crown Molding and Baseboard Ideas, Because It’s 2017 | Molds For Injection Molding
You can replace that plaster crown molding, but it’ll cost you | Molding Design

With a sound enterprise credit history, exceptional after-sales services and modern production facilities, we've earned an outstanding track record amongst our consumers across the whole world for China OEM 3d Plastic Mold - Plastic Injection Molding For Trash Can / plastic bucket – Zetar, The product will supply to all over the world, such as: Mecca , Bangalore , Indonesia , We focus on providing service for our clients as a key element in strengthening our long-term relationships. Our continual availability of high grade products in combination with our excellent pre-sale and after-sales service ensures strong competitiveness in an increasingly globalized market. We are willing to cooperate with business friends from at home and abroad and create a great future together.
  • The customer service reprersentative explained very detailed, service attitude is very good, reply is very timely and comprehensive, a happy communication! We hope to have a opportunity to cooperate.
    5 Stars By Mike from Nairobi - 2016.09.22 11:32
    The factory technical staff gave us a lot of good advice in the cooperation process, this is very good, we are very grateful.
    5 Stars By Penny from Bolivia - 2015.06.19 10:42
    WhatsApp Online Chat !