OEM Supply Overmolding Injection Molding - Plastic Injection Molding For Trash Can / plastic bucket – Zetar

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

Which has a positive and progressive attitude to customer's desire, our corporation constantly improves our merchandise quality to satisfy the desires of consumers and further focuses on safety, reliability, environmental demands, and innovation of Injection Molding Parts Suppliers , Injection Molding Supply Company , Plastic Injection Mold Service , We can do your customized order to meet your own satisfactory! Our company sets up several departments, including production department, sales department, quality control department and sevice center, etc.
OEM Supply Overmolding Injection Molding - Plastic Injection Molding For Trash Can / plastic bucket – Zetar Detail:

Mold Description:

1-Start from part design analysis

2-Mold design drawing and DFM report available so you can see how is the mold going to be before mold making

3-If product is complex,moldflow report will be present as well

4-In house mold making shop ensure you mold quality under well control.

5-Normally it takes 20-40 days to make mold,precise time depends on part design

Company Information:

Zetar Industry Co.,Limited from Shanghai China.
Our company has In-house tooling shop- fully equipped 6000 square feet tool room,making sure your molds making in house,providing free mold routine maintenance,and also mold repair work if you need.
Meanwhile 90 ton – 1100 ton injection molding machines 20 sets,30000 square feet injection molding room including 250 square feet M7 class clean room.We can produce parts from 0.01pound to 13 pounds.
If you have any plastic related product need to make,please feel free to email me info@zetarmold.com
www.zetarmold.com

FAQ:

1. Are you a trading company or a manufacturer?

We are a manufacturer as you can see our workshop as above.

2. What kind of trade terms can you do?
 EX-WORKS,FOB,CIF,DDP DDU
 
3. What is your terms of payment?
 50% Mold cost deposit,balance mold cost +50% production cost paid when samples confimed,Balance production cost paid against copy of B/L. We accept T/T
 
4. Do you support OEM ?
 Yes, we can produce by technical drawings or samples.
 
5. How about your delivery time?
 Generally, it take 40 days ( 30 days do mold and 10 days do mass production).
 
Welcome to contact us: 
TEL: 0086-13564311131
Website:www.zetarmold.com

Product detail pictures:

OEM Supply Overmolding Injection Molding -
 Plastic Injection Molding For Trash Can / plastic bucket – Zetar detail pictures

OEM Supply Overmolding Injection Molding -
 Plastic Injection Molding For Trash Can / plastic bucket – Zetar detail pictures

OEM Supply Overmolding Injection Molding -
 Plastic Injection Molding For Trash Can / plastic bucket – Zetar detail pictures

OEM Supply Overmolding Injection Molding -
 Plastic Injection Molding For Trash Can / plastic bucket – Zetar detail pictures

OEM Supply Overmolding Injection Molding -
 Plastic Injection Molding For Trash Can / plastic bucket – Zetar detail pictures

OEM Supply Overmolding Injection Molding -
 Plastic Injection Molding For Trash Can / plastic bucket – Zetar detail pictures


Related Product Guide:
Add custom jewelry to the list of products now made using 3D printer | Molding Design
Form 10-K Gaming Partners Internat For: Dec 31 | Molding Design

We now have our own gross sales team, style and design workforce, technical crew, QC workforce and package group. We now have strict quality manage procedures for each system. Also, all of our workers are experienced in printing industry for OEM Supply Overmolding Injection Molding - Plastic Injection Molding For Trash Can / plastic bucket – Zetar, The product will supply to all over the world, such as: Canberra , Zambia , UK , Our company will continue to adhere to the " superior quality, reputable, the user first " principle wholeheartedly. We warmly welcome friends from all walks of life to visit and give guidance, work together and create a brilliant future!
  • The factory has advanced equipment, experienced staffs and good management level, so product quality had assurance, this cooperation is very relaxed and happy!
    5 Stars By Sabrina from Danish - 2016.11.12 12:31
    This company has the idea of "better quality, lower processing costs, prices are more reasonable", so they have competitive product quality and price, that's the main reason we chose to cooperate.
    5 Stars By Eunice from Somalia - 2016.09.26 12:12
    WhatsApp Online Chat !